Laserfiche WebLink
Inlet and Outlet Facilities for Reservoir <br />J 1 Portable pump and ancillary equipment 1 Unit Note 1 0 <br /> Berms <br /> 1 Berm Removal 32,593 CY 0.85 27,704 <br />K 2 Seed and IVlulch 2.02 Ac 675 1,364 <br /> 3 Reseed (20%) 0.40 Ac 675 273 <br />Total Disturbance Costs 650,122 <br />Contractor Mobilization/Demobilization (890) 52,010 <br />Overhead (18.5%) 120,273 <br />Administration (59'0) 32,506 <br />Total Proposed Financial Warranty $ 854,910 <br />Disturbed Acreage 96 <br />Financial Warranty per acre $ 8,862 <br />Note 1: Temporary structures, pumps, and ancillary equipment is assumed to be removed by the operator or sold to finance <br />removal <br />