Laserfiche WebLink
1 ? <br />(Page 2) <br />MINE ID # OR PROSPECTING ID # M-1985-023 <br />INSPECTION DATE 9171_ 2006 <br />OBSERVATIONS <br />INSPECTOR'S INITIALS SSS <br />program for <br />conditgortlsgfor use inspection in updating the <br />This was a routine partial inspection of the Hllµnas e <br />permitted sites also Iconducteddto verify current Division's <br />in Colorado. The inspection St <br />reclamation cost estimate, ensuring the e State holds enough financial warranty to cover reclamation liabilities at this site, Russ <br />Means (DRMS) accompanied during the inspection. that requirem <br />3.1 <br />ule <br />.12 The affected area boundary markers were not observed and must be installed per <br />or oche Pmarkers that a e entsearly Rs ble and adequate <br />state: The boundaries of ?he affected area will be marked by monuments <br />to delineate such boundaries. The lack of boundary markers is noted as a problem with the corrective action(s) and correction <br />date specified on the last page of this report. <br />No significant infestations of noxious or other problematic weeds were noted on site during this inspection. <br />No significant erosional features were noted on the affected areas of the site, rem <br />nts of the in an effort to ensure the financial warranty remanrs ostladequat to reclaim this es maee (copy encl siteClearlyper sQel is currently undea bonded. <br />reclamation plan, DMG has updated the reclamation ate <br />ty mu Therefore, pursuant to Section 34-32.5-117(4) °of this report. Please review the"enc osed figures warransoon as <br />be submitted to DMG within 60 days of the mailing date <br />possible and contact our office if any calculation errors are noted. elting, <br />con The site still has quite a bit of debris from previous asphalt production. Several i anks, d ds, thoses he encrubber losed beclam t oncrese <br />debris <br />and <br />supports, piles of reject, and tires remain on site. Disposal costs for this <br />estimate, as is ripping and burial costs for the a po a irs amount similar aeto the current amount of ? P5,7tl6 isposaThel of <br />bond . The <br />increased <br />asphalt would reduce the updated bond amount the <br />within the 60 <br />consider completing this debris reclamation <br />account oaths wok performed. Ina y case the operato should contact <br />reduced <br />reclamation cast estimate could then be <br />the Division to specify how they choose to handle the increase in reclamation liability. <br />The site does have intermittent operation status, and has not been active in some time. <br />Responses to this inspection report should be directed to Steve Shuey at the Division of Reclamation, Mining and Safety, <br />Grand Junction Field Office, 101 South V Street, Room 301, Grand Junction, t;olorado 81501, phone number 970-243-6368. <br />I & E Contact Address <br />NAME Gene Hollenbeck <br />OPERATOR Hollenbeck, Inc. <br />STREET P. O. Box 902 <br />CITY/STATE/ZIP Gunnison CO 812311 <br />cc: <br />0 CE <br />D BL <br />? FS <br />p HW <br />? HMWMD (CH) <br />? SE <br />? WQCD (CH) <br />0 OTHER