My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-06_REVISION - C1981010 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2008-08-06_REVISION - C1981010 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:15 PM
Creation date
8/7/2008 2:48:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
8/6/2008
Doc Name
Bond Release Application
From
Trapper Mining Inc
To
DRMS
Type & Sequence
SL8
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 PHASE I BOND RELEASE <br />This application for Phase I bond release of applicable Trapper Mine lands is submitted in accordance <br />with the Colorado Division of Reclamation, Mining and Safety (DRMS) Rule 3.03 (Release of <br />Performance Bonds) and Guideline Regarding Selected Coal Mine Bond Release Issues of April 18, <br />1995. With this submittal, Trapper is proposing to release 476.6 acres of land, reclaimed between 2003 <br />and 2007, from Phase I bond liability as outlined on Map 1.0. This includes all lands that have been <br />regraded, with drainages reestablished in accordance with Trapper's approved permit document (C-81- <br />010), as outlined on Map 1.0. <br />While Map 1.0 breaks out major watershed boundaries, the single block proposed for bond release <br />encompasses all recontoured watersheds as outlined. All reclaimed parcels that are included within this <br />Phase I bond release block are included on Map 1.0. <br />1.1 Post-mining Topography Demonstration <br />Map 1.0 provides as-built post-mining topography contours for all Trapper Mine lands regraded through <br />2007. The map was constructed from aerial photogrammetry data collected in October 2007. Post- <br />mining topography has been presented to and approved by the Division in annual reports (technical <br />revisions) for each year that reclaimed land parcels are included in this bond release request (i.e., <br />2003=TR-93; 2004=TR-95; 2005=TR-97; 2006=TR-100 and 2007=TR-102). Representative cross <br />sections comparing as-built topography with approved topography would be the same as those given in <br />Permit Document C-81-010, therefore, no cross sections are included in this application. <br />1.2 Drainage Reestablishment Documentation <br />As explained in Section 1.1 for topographic cross-sections, drainage profiles comparing as-built and <br />approved drainage profiles will likewise be the same as those given in C-81-010. All reestablished <br />drainages are delineated on Map 1.0. <br />Trapper Mine has spared no effort and expense in constructing reestablished drainages that effectively <br />control erosion and downstream sediment deposition. A variety of sediment control materials and <br />methods and sediment reducing measures have been implemented on reestablished drainages. <br />Rock check structures are used to dissipate the energy of flowing water within drainage channels. Debris <br />and sediment tend to be deposited and trapped upstream of structures. This in turn permits <br />establishment of vegetation behind structures which further stabilizes the channels. In addition, core <br />trenches are installed in rock check structures, thus providing additional structural support and reducing <br />the potential of downstream headcutting to move upstream. <br />1
The URL can be used to link to this page
Your browser does not support the video tag.