Laserfiche WebLink
18RT MINE ATMOSPHERE CONTROL BOREHOLE(S) <br />RECLAMATION COST ESTIMATE (MR08-229) <br />Facilities Demolition and Removal <br />Well-head Reclamation <br />Remove 6-foot diameter CMP cap - (1 @ $1,000 ea) $1,000 <br />Borehole Reclamation <br />Plugging and sealing materials - (2 x 22' x 24" dia., 140cy cement @ $70/cy) 9,800 <br />Plugging and sealing labor - (8 hrs @ $250/hr) 2,000 <br />Backfill - (2 x 1,000' x 24" dia., 250 cy x $1.20/cy) 300 <br />Subtotal $12,100 <br />Remove Portable Equipment <br />Tractor-trailer w/winch - (1/2 day) 350 <br />Fencing Removal <br />Fence removal - 400' @ $2.75/ft $1,100 <br />Site Reclamation (Included under TR04-44 for 18RT Ventilation Shaft) <br />Subtotal - All Direct Costs $14,550 <br />Indirect and Administrative Costs N( 8%) $1,080 <br />Total Estimated Reclamation Cost $15,630 <br />Notes: Costs from Means Site Work and Landscape Cost Data and recent bond calculations <br />MR08-229 07/30/08