Laserfiche WebLink
STORMWATER ANNUAL REPORT - SAND AND GRAVEL <br />COLORADO DEPT. OF PUBLIC HEALTH & ENVIRONMENT <br />Water Quality Control-Division <br />WQCD-P-B2 <br />4300 Cherry Creek Drive South <br />Denver, Colorado 80246-1530 <br />Make enough copies of form for each reporting year. Or go to <br />http: //www. cdphe. state. co. us/wq/Permits Unitlstonnwater/industrial. html <br />4, , vt-\, <br />XT foucv? e, <br />Check if this is a <br />new name, address, etc. <br />Permittee (Compan 1y, WIN,). ?( - <br />Facility Name: V t r - <br />Mailing Address: (?Jox ?D °J P-p- ` v <br />Facility Phone Number: ( q-70) -3 5- <br />Permit Certification No. COR-34 j_ 9 j_l= v3 <br />Reporting Period: Jan. 1-Dec. 31, 20 O (Form is due by Feb. 15 of the following year) <br />**Each section must be completed. Please print or type.** <br />A. A report on the facility's overall compliance with the SWMP. (Include here a summary of any measures <br />taken to comply with your Stormwater Management Plan (SWMP), to fully implement it, changes or <br />improvements made in any of your Best Management Practices (BMPs), employee training, spills, other <br />problems encountered, etc. How is your plan working?) <br />tea r C° ; ve v d( r" v-P-V t <br />a Cco 54 km VU M_ A? <br />\3 V <br />Were changes-made to your SWMP? No _ Yes - Describe changes on a separate sheet. <br />B. A summary of each comprehensive stormwater facility inspection made, including date findings, and action <br />taken. (The permit requires at least two comprehensive facility inspections per year - see page 8 of the <br />permit. Include here a summary of those inspections, plus any other comprehensive inspections made. It is <br />not necessary to summarize day-to-day inspections, unless significant problems were noted.) <br />otted.) <br />First Inspection - Date & / 0/_q . Findings, and action taken: 00 54V4 ''? V-6 c ' _ <br />_L? <br />Cs-?- <br />Note - form may be reproduced Page 1 of 2 09/07dj