My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permit File - 8/5/2008, 3:19:14 PM-SW1
DRMS
>
Public
>
Permit File - 8/5/2008, 3:19:14 PM-SW1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:42 PM
Creation date
8/5/2008 3:43:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008048
IBM Index Class Name
Permit File
Doc Date
7/24/2008
Doc Name
Items to complete NOI App. (non-conf.)
From
MackRiser, Fogo & Trezise, LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v (1~otm 2- Public) <br />(or new NOI). A separate prospecting notice shall be filed with the Office; for each non-contiguous land survey quarter <br />section in which a proposed prospecting activity is to occur. The requirement for separate notices may be waived by the <br />Oflice .for good cause (Rule 5.1.1). <br />ANNUAI. REPORTS: <br />Annual Reports are required for alt active prospecting operations effective on December 31, 2006. I3y December 31 of <br />each year that the NOI is in effect, the prospector must file an annual reclamation report detailing the exploration <br />and reclamation activities that occurred during that year and whether prospecting has been completed. For the <br />purpose of reporting prospecting activities, the reporting year shall begin on November 1 and end on October 31.The report <br />must be accompanied by an annual fee in the amount of $86. <br />RECLAMATION: <br />Reclamation shall be completed in a timely manner and within five (S} years of completion of prospecting activities. The <br />time period to complete site reclamation commences on the date that prospecting has been completed, as stated in the <br />Annual Report {Rule 5.t.2(g)). New or significantly upgraded roads, structures, or othex features on private lands that are <br />planned to be retained following prospecting may be identified in the NUI submittal and may be excluded from the financial <br />warranty amount at the discretion of the office. The prospector must submit a notarized letter .from the landowner requesting <br />that the roads, structures or other .features remain on site and demonstrate that it meets the applicable County zoning and <br />code requirements. <br />RELEASE OF F.INANC.IAL WARRANTY AND TEItt~IINATION OF THE NOI: <br />Upon completion of any phase of reclamation, you should consult Rule 3.1 for reclamation standards and Rule 4.15 for <br />details on how to request a reclamation responsibility release from the i'bILRB. Following the completion of reclamation, the <br />prospector may request a release of the reclamation responsibility sent by certified mail `l'he Division wilt conduct an <br />inspection within 30 days of receiving the request (or as soon thereafter as weather conditions permit). If the operation is <br />located on Public Land or State Land, the Division will coordinate the inspection with the appropriate land management <br />agency (Rules 3.1 and 4.1.5). <br />COMPLIANCE WITH OTHER LAWS: <br />Compliance with the Act and Rules and Regulations of the dined Land Reclamation Board does not relieve you of <br />responsibility to comply with all other applicable local, state and federal laws. We recommend that you contact the <br />following agencies and any others to determine whether you need to comply with their legal requirements: <br />• The Colorado State Historical. Preservation Office regarding properties of potential historical significance; <br />• Colorado Division of Water Resources regarding water rights: <br />^ Colorado Department of 1'ubfic Health and the Is'nvironrrtent, Water. (luality Control Division, regarding the <br />potenti.a] to discharge pollutants into the State waters; <br />• Colorado Departtent of Public F3.ealth and tlje [?nvircmment, Air Pollution (:"vntrof Division, with regard to the <br />potential need for a fugitive dust pertait; <br />• €:.5. Bureau of.'I:.and Managernc;r~t or the tJ.S. laores€ Service if'the proposed. operationrs on federal lands; <br />^ U.S. Army Corps of F~ngineers regarding a dredge arld fill (404j permit; anti <br />• '1"he County Planning t7e~partrnent for the eotrnt}r or counties in ~.vhich the proposed operation is located. <br />AU7'HORIIED SIGNATL!RF,: <br />You, or a person authorized by you, must sign the irlOI. By doing so ycxr are stating that the; informatiott provided in t}ze <br />Zv'OT is true and correct as of the date specified. Far individuals, the NOI must be signed by lire NOI holder or the person <br />authorized to sign on the NOI holder's behalf: For companies or part:ttersh.ips, the Nt}I trust be signed by a person acting <br />under the company'slpartnership's express or ixrrplied authc~rtty, or by an atrth.orired agent. <br />SUB14II1' C()MPLETItsI) NC3Is I'(7 ()NIt OIi 'I'tI.I: OI<I+IC;I;S E3Is;L01'V: <br />
The URL can be used to link to this page
Your browser does not support the video tag.