Laserfiche WebLink
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 07/22/2008 <br />User : ACS <br />State :Colorado <br />County :Weld <br />Site :Centennial Project <br />Agency or organization name :Colorado Division Of Reclamation, Mining, And Safety <br />Permit or other job action :New Prospecting Notice <br />Task description :Backfill and replace fopsoi/ in mud pits <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 311 C U <br />Horsepower : 79 <br />Weight (MT) : 11.94 <br />Cost Breakdown : Utilization <br />Ownership cost/hour : $17.55 NA Shift basis : 1 per day <br />Operating cost/hour : $20.47 100 Data source : (CRG) <br />Operator cost/hour : $32.96 NA <br />Total unit cost/hour : $70.99 Total fleet cost/hour : $70.99 <br /> <br />MATERIAL QUANTITIES __ .. _ _ ,, _ _ ., _ _ .. ., _ .. _ _ __ <br />Initial Swell Loose <br />volume : 170 BCY factor : 1.250 volume : 212 LCY <br /> <br />Source of estimated volume :10 pits @ 5'x 15'x 6' <br />Source of estimated swell factor :Swell table, earth dry packed <br /> <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swin4 loaded, dump bucket, swing emgtyl <br />Basic job condition description : SEVERE <br />Secondary job condition within basic description : SEVERE <br />Cycle time value : 0.33 minutes <br />Bucket Capacity <br />Rated bucket capacity : 0.68 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.50 ~, USER-PROVIDED BUCKET FILL FACTOR <br />Adjusted bucket capacity : 0.34 ~ LCY <br />Job Condition Correction Factors Source <br />Site altitude : 5,000 feet Altitude adjustment : 1.00 ~ (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shiff/day) <br />Net job correction : 0.83 multiplier <br /> <br />Unadjusted hourly unit production : 62.77 LCY/hour <br />Adjusted hourly unit production : 52.10 LCY/hour <br />Adjusted hourly fleet production : 52.10 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 I excavator(s) Total job time : 4.08 hours <br />Unit cost : $1.363 per LCY Total job cost : $290 <br />Permit/job # :P-2008-043 <br />Abbreviation :none <br />Filename :P043-003 <br />