Laserfiche WebLink
BILIZATION / DEMOBIL <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name :Colorado Division Of Reclamation, Mining, And Safety <br />Task # : 001 State :Colorado Permit/job # : P-2008-043 <br />Date : 07/22/2008 County :Weld Abbreviation :none <br />User : ACS Site :Centennial Project Filename :P043-001 <br />Permit or other job action :New Prospecting Notice <br />Task description :Mobilize and demobilize equipment needed for reclamation <br />..........................................................................................::::::::::::::::::::::::.::::.::::.P:::::::::: y:::::::::::::::::::::::::::::::::::. <br />E:::.UIPMENT TRANSPORT RI :::::............................................................................................................................................................................................................... <br />Q G COST Shift basis : 1 er da <br />Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : 'Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine Weight/unit Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT permit <br />Description (Tons) Cost/hr/unit Cost/hr/unit (No. units) Cost/hr/fleet Cost/hr/fleet Cost/fleet <br />-Cat311CU 13.16 $17.55 $88.67 1 $106.22 $88.67 $0.00 <br />Subtotals :~ $106.22 $88.67 $0.00 <br />