My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permit File - 8/5/2008, 3:13:04 PM-SW1
DRMS
>
Public
>
Permit File - 8/5/2008, 3:13:04 PM-SW1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:42 PM
Creation date
8/5/2008 3:43:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008022
IBM Index Class Name
Permit File
Doc Date
7/25/2008
Doc Name
Vex claims Notice of Intent Application
From
DRMS
To
Buys and Associates Inc
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />MENT MOBILIZATION /DEMOBILIZATION <br />PROJECT IDENTIFICAT gency or organization <br />name :DRMS <br />sheet 1 of 2 <br />Task # : 058 State :Colorado <br />Date :07/22/2008 County :Montrose <br />User : GRM Site :Vex Claims <br />Permit or other job action :Final Reclamation Liability Estimate _ <br />Task description :%1111f1a1 l110b11%Zaf/0/1 t0 Sife <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Cost Breakdown <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-CAT 246 (2004) 3.58 $5.55 $88.67 1 $94.22 $88.67 _$0.00__ <br />-CAT 4468 (2004) 9.80 $16.86 $88.67 1 $105.53 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $199.75 $177.34 $0.00 <br />Available rig capacities : 0-25 Tons 26-50 Tons 51 + Tons <br />Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />Permit/job # :P-2008-022 <br />Abbreviation :none <br />Filename :P022-05a <br />
The URL can be used to link to this page
Your browser does not support the video tag.