My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permit File - 8/5/2008, 3:13:04 PM-SW1
DRMS
>
Public
>
Permit File - 8/5/2008, 3:13:04 PM-SW1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:42 PM
Creation date
8/5/2008 3:43:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008022
IBM Index Class Name
Permit File
Doc Date
7/25/2008
Doc Name
Vex claims Notice of Intent Application
From
DRMS
To
Buys and Associates Inc
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Date : 22-Jul-2008 <br />User : GRM <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />Permit or job no. <br />Abbreviation <br />Filename <br />P-2008-022 <br />none <br />P022-000 <br />Site :Vex Claims <br />State :Colorado <br />County :Montrose <br />Agency or organization name :DRMS , - - - <br />Permit or job action :Final Reclamation Liability Estimate _ - _ <br />TASK LI ST (DIRECT COSTS) FORM FLEET <br />SIZE TASK DIRECT <br />HOURS COST <br />NO. TASK DESCRIPTION USED <br />l <br />h <br />1 _ <br />$318 <br />0 <br />10 <br />01a - <br />- <br />02a_ - <br />03a - seal 10 two inch drill holes <br />misc. earthwork 2 pads and reclamation <br />road and mud pit reclamation o <br />e <br />bore <br />loader <br />loader 1 <br />1 <br /> <br />1 _ _ <br />. <br />9.6 __ ~ __$502 <br />19.4 __ _$1,427 <br />24 <br />0 $3 <br />054 <br />04a - <br />- <br />05a - reveg of 1.64 proposed acres of disturbance <br /> <br />initial equipment mobilization to site revege <br />mobilize <br />4 <br /> <br />2 . <br />, <br />__.__ __ <br />3.3 __$704 <br />3 <br />0 $295 <br />06a - secondary reclamation mobilization mobilize , <br />_ _ - __ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> S UBTOTALS : 69.41 $6,300 <br /> <br />o <br />NA ~0 TOTAL DIRECT COST = <br />`~ $6,300 <br />* includes inflation factor adjustment of : <br />INDIRECT COSTS <br />02 <br />2 <br />% of direct total = <br />$~~~ <br />ovERHEAO AND PROFIT - Liability insurance : . total = _ <br />$66 <br />Performance bond : 1.05 % of direct _ _ <br />Job superintendent : NA` NA NA total = _ _NA <br />Profit : 10.00 % of direct total = $630 <br /> TOTAL O & P = $8 <br />23 <br />* not required (or eqp. operator serves as super.) - <br />CONTRACT AMOUNT (direct + O & P) _ _ _ <br />_ <br />$7,123 <br />LEGAL -ENGINEERING -PROJECT MANAGEMENT - tal $ NA total = <br />t ~ <br />Financial warranty processing (legal/related costs) : 500.00 _ <br />o <br />tal = <br />t - <br />NA <br />Engineering work and/or contract/bid preparation : NA o <br />NA NA <br />NA total = _ _ __ _ _ <br />$ <br />Reclamation management and/or administration : 5.00 % of cntr. NA <br /> NA" NA total = <br />CONTINGENCY - <br />' <br />' <br />TOTAL INDIRECT COST = <br />$1,680 <br />' <br />* contingencies accounted for at task level TOTAL BOND AMOUNT (direct + indirect) _ <br />- - $7,980 <br />
The URL can be used to link to this page
Your browser does not support the video tag.