Laserfiche WebLink
,.; <br />aneneR~ F t`rn upnnFNT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br /> <br />-Light Duty Pickup, 4x4, 3/4 T. $30.93 1 $30.93 $30.93 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $30.93 $30.93 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Naturita <br />Transportation Cycle Time : Non- Total one-way travel distance : 10.0 miles <br /> Roadable Roadable Average travel speed : 40.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.25 0.25 Total non-roadable mob/demob cost' : $279.89 <br />Return time (hours) = 0.25 ~ 0.25 * two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ~* : $15.47 <br />Unloading time (hours) = 0.50 N'A ~• one round trip, no haul rig <br />Subtotals = 1.50 0.50 <br />_. <br /> <br />JOB TIME AND COST <br />,: <br /> <br />Total job time : <br /> <br />3.00 _ hours <br /> Total job cost : $295 <br />