My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 8/5/2008, 3:12:32 PM-SW1
DRMS
>
Public
>
PERMIT FILE - 8/5/2008, 3:12:32 PM-SW1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:42 PM
Creation date
8/5/2008 3:43:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008022
IBM Index Class Name
PERMIT FILE
Doc Date
7/15/2008
Doc Name
Notice of Intent to Conduct Prespecting
From
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 ~~b ~, ~ ' ~~ ~~ ~ 6 fJ~ <br />3. Describe t}re estimated topsoil depth and how topsoil wilt be salvaged, stockpiled and redistributed far the re-establishment of <br />vegetation. Specify appraxinaate topsoil redistribution depth: <br />6" of topsoil exist. If topsoil is striped it will be stockpiled in windrows on the <br />uphill side of the disturbed area. Blading or grading is not proposed at the drill <br />sites unless the drill site is not level enough to accommodate the drilling rig. If <br />leveling is required the drill site would be 20 -feet in width and 40-feet in length <br />and accommodate the rig, water storage, drilling equipment, drilling supplies and <br />multiple crew vehicles. The rig would be oriented to minimize surface disturbance and <br />insure the most level area possible. Minor cuts and fills may be generated and have been <br />included in the disturbance estimate within the 20' by 40' area. <br />4. Describe how drill holes will be plugged {refer to Rule >.~l of the Rules for required abandonment procedures:): <br />Providing that no water is encountered while drilling, the hole would be back-filled <br />and a 20' cement surface plug would be installed in the hole. In the event that water <br />is encountered during drilling, bentonite chips would fill the abandon hole and a 20' <br />cement cap placed over the bentonite chips to surface. Should an alternate plugging <br />method be requested by the BLM that procedure would be followed. Drill cuttings would <br />be spread over the surrounding area. <br />5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rute 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />No other disturbances are proposed except for drill holes and access roads. <br />fi. Describe how raads will be reclaittteti o~ returned to their pre-prospecting (or better} condition: <br />New roads will be reshaped to original contour and roughened with a backhoe then <br />reseeded and covered by hand raking or four-wheeler and harrow leaving a roughened surface. <br />Obstacles would be place to preclude travel along the reclaimed route. Existing roads <br />would be reclaimed utilizing the same procedure unless directed to leave the existing <br />roads open by the BLM. ----________~_.w_______~__._w____~___.___~___~__. <br />
The URL can be used to link to this page
Your browser does not support the video tag.