Laserfiche WebLink
CIRCES Cost Estimating Software <br />WHEEL LOADER -LOAD AND CARRY WORK <br />_... <br />PROJECT IDENTIFICATION <br />Task # : 02a State :Colorado PermiUjob # : P-2008-021 <br />Date <br />User <br />07/02/2008 <br />rann <br />County :Montrose <br />Site :Atkinson Mesa <br />Abbreviation :none <br />Filename : P021-02a <br />Agency or organization name : DRMS <br />Permit or other job action :Final Reclamation Liability Estimate <br />Task description :misc. reclamation earthwork: roads and pads <br /> <br />. . <br />...: <br />HOURLY EQUIPMENT COST Basic machine .CAT 4468 (2004) <br /> <br />Horse ower: <br />_ . <br />102 <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day_ <br /> Data source : (CRG) <br /> <br />Utilization _ <br />Cost Breakdown : Ownership cosUhour : $16.86 NA <br />Operating cost/hour : $23.84 100 <br />Operator cost/hour : $32.78 NA <br />Total unit cosUhour : $73.47 Total fleet cosUhour : $73.47 <br /> <br />,, . <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume : 1,402 LCY factor : NA volume : 1,402 LCY <br />Source of quantity take-off :Notice <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION (Cat HB) <br />Loader Cycle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.475 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material: Mixedmaterial 0.020 (CatHB) <br />Stockpile : No adjustment -factor not applicable 0.000 (Cat HB) <br />Truck ownership : No adjustment -factor not applicable 0.000 (Cat HB) <br />Operation : Inconsistent operation 0.040 (Cat HB) <br />Dump target : Fragile target 0.050 (Cat HB) <br />rver cyae ame aalusuneni <br />Adjusted basic cycle time <br />Rollino Resistance -Road Conditions <br />Haul :Rutted dirt, little maintenance, no water, 1"tire penetration <br />Return :Rutted dirt, little maintenance, no water, 1"tire penetration <br />0.585 minutes <br />Haul and Return Time Length <br />(feet) Grade res. <br />(%) Rolling res. <br />(%) Total res. <br />(%) Travel time <br />(minutes) Data <br />Source <br />Haul route : 200 5.00 4.00 9.00 0.2179 (Cat HB) <br />Return route : 200 -5.00 4.00 -1.00 0.0845 (Cat HB) <br /> Total travel time : u.suzv nmiuiC~ <br />Loader Bucket Caaacity Total cycle time : 0.887 minutes <br />Rated capacity : 1.50 LCY (heaped) (Cat HB) <br />Bucket fill factor : 1.100 Other - rock/dirt mixtures (100-120%) <br />Adjusted capacity : 1.65 LCY <br /> Source <br />Job Condition Correction Factors Altitude adjustment factor : 0.97 (Cat HB) <br />Site altitude : 6,000 feet Job efficiency factor : 0.83 (1 shifr/day) <br /> Net correction : 0.81 multiplier <br />Unadjusted hourly unit production : 111.56 LCY/Hr <br />Adjusted hourly unit production : 89.82 LCY/Hr (Cat HB) <br />Adjusted hourly fleet production : $9.$2 LCY/Hr <br />;;; , <br />JOB TIME AND COST <br />Fleet size : 1 Loader(s) Total job time : 15.61 Hours <br />Unit cost : $0.818 /LCY Total job cost : $1,147 <br />