Laserfiche WebLink
3 (Form 2-Public) <br />C. L,UCATIQN iriAP: Attach a USGS 7.5 minute quad. or similar map of adequate scale, which locates the prospecting <br />site{s). <br />D_ Are prospect sites (e.g., drill holes, trench locations, etc...) staked on the ground? Yes ~ No <br />E. Specify the Land Management Agency, Address and Telephone Number: <br />.; ~ _ <br /> <br />-- -- ~ -- <br />,/nG~t9 1'~i9i~Z ~°/~.c}6e'2 /I/Si~GT <br />F. The ptvspecmr is c~tued W document that the NOI has been sent to the BLM or the USFS. Processing of the NOI will <br />not begin until the pro~r bas'submitoed evidence acceptable to the Division that the NOI was sent to the BLM or <br />USFS. Check one: <br />Evidence of notification is attached to this NOl for BLM Land <br />_~Evidence of notification is attached to this NOI for USFS Land. <br />Other proof of notice is attached to this NOI <br />ll. MAPS & DRAWINGS <br />Aocarate topographic base wrap showing the location of the proposed project nntst be submitted with this notice. The prospector <br />may subtnit a U.S.G.S. 7.5 urinate quadrangle, or sinmirar an<p of adequate scale that <br />I. the pmposod p site(s) or activity areas involving snrfacx disdabance_ Activity areas include all drill holes, <br />nmrd pits, e:rcavatioffi, hendtes, aditsy s6atls, tuatkels, tack dumps, stockPdes, iraprnurdrnents and prospectueg roads, and <br />2 ioch~des sufficient detail tv identify and' locate lmown ~ featozes and facilities that may be atI'ected aril those that <br />are root anticip~od oo be affecood. This includes the location of all dnU holes, mnd pits, excavations, trenches, edits, shafts, <br />tunnels, rode dins, stodq~des, sad ~ r~ozid4. Cobr phas, ~ labeled (~ <br />date, orientation and location}, of the prong site may be used to lis15II this r:>~eraeat if inclndod wiW the NOI <br />sabmittaL <br />III PROJECT DESCRIPTION <br />1. A3irieral(s} and/er Kesouree(s) being Iaves~ted: !~i ~,y~c~-~ ~~ i C- <br />2. Estimated dates of commencement and congitetion: <br />Commencement: __S~s~>C~~i'I / ~GO~ <br />Completion: /~l/a2c/-~ 4l. ~~ <br />3. Amount of material to be extracted, moved or proposed !a be moved:_ ry~ ~ . i1 <br />4. Identify the type or method of prospecting proposed and gnaa6tr,~tace as "X"} . <br />Cuts Pits Trenches i <br />_Shafts Tunnels Adits - Declines , <br />Air Dri}ling Fhiid Drilling -Drilling & Blasting , <br />