Laserfiche WebLink
lvo•rFs <br />• 1'he reason we arc not drilling all the way across this depression in a sin~lc hole i5 <br />due to the type; oi'rig we are using for this project. The C'Ml: R50 has a nwxinunn <br />drill hole length capacity of 2QQm for R(' which confines us to 20(hn or lcs tier <br />each hole. lt• it is possible to obtain a rig ~~-ith the ability to reach highrr depths we <br />can eliminate: the other hole as well Gom the program <br />• The second hole at this target also enables us to properly test this target by <br />providing us with a cross sectional view of Uie underlying geology at this <br />location. <br />CML Drill flan 20UK <br />