Laserfiche WebLink
3 (Form 2-Public) <br />C. LOCATION i41AP: Attach a LiSGS 7.5 minute quad, or similar map of adequate scale, which locates the prospecting <br />site(s). 3; <br />D. Are prospect sites (e.g., drill holes, trench locations, etc...) staked on the ground? Yes ~No <br />E. Specify the Land Management Agency, Address and Telephone Number: <br />~,Ec-.~a7/-test ,~n.L~:S-st ~ / c;..,c;l._.. ~,~ /''' <br />2.~._~G7 ~/'>-yc,'Tii'cR ~/.Q~ICrN iii/i~~L~/ ' C'_ <br />F. The prospector is required Gn document that the NOI has been sent to the BI M or tl~ USFS. Processing of the i,IOI will <br />~t begin until the prospecwr has submitted evidence aeceptabk to the Division that the IVOI was sent to the BLM or <br />USFS. Check one: <br />Evidence of notification is attached to this NOI for BLM Land <br />`/Evidence of notification is attached to this NOI for USFS Land. <br />Other proof of notice is attached to this NOI <br />II. MAPS & DRAWINGS <br />Accurate topographic base orals showing th'e location of the proposed project must be submitted with this notice. The prospector <br />may submit a U.S.G.S. 7.5 minute quadrangle, or similar map of adequate scale that. <br />1. identifies the proposed prospecting site(s) or activity areas involving surface disturbance. Activity areas inclade all drill holes, <br />mad pits, excavations, trenches, adits, shafts, ttuurels, rock dumps, stockpiles, impoundments and prospecting roads, and <br />2. includes sufficient detarl to iderrrify a~ k-cate known prospecting features at~cl facifuies that may be alTecoed asd those that <br />are not anticipated to be affected. This inchrdes the Locatmn of all drill holes, mud Pits, earavatioos, a~eaches, adits, shafts, <br />tunnels, rock dumps, stockpiles, innpotndments and roads. Color phosogtsPhs, adaquatety labeled (mcLrdmg <br />date, orientation and ktcation}, of the prospecting sine may be used b fidfiU Ibis t+oquhetnent if iachtdod with the IYOI <br />submittal. <br />IiI PROJECT DESCRIPTION <br />i . I4fraerai(s) and/or Resources} being L-vestigated: ~1I ~~i_~.2~ i r" <br />2. Estimated dstea of comttmteettoent sttd aotnPteHon: <br />Coanrnertcetnent: ___5'C~?crwr~e~t / . ~~ 8 <br />Completion: .ti/~-/Ze~~ 5'/ 2~9 <br />3. Amount of material to be erttraeted, mof~ed er proposed to he tuaved _ f 9 Z e~c - ~l <br />d. Identify the h*pe or method of ptisg Proposed sad quantity (place aa'~X") <br />Cuts Pits 1 Trenches <br />Shags ~ Tunnels ~ Adits Declines <br />. -----,- <br />V Arr I7rr7lirtg Fluid Dn~iling ` Dnlliag & Blasting <br />