Laserfiche WebLink
<br />7 (Form 2- Public) <br />7. List the seed mixture to be used in the re-establishment of vegeratiaa~_ See the attached seed mixture calculation to obtain <br />PLS/acre. For assistance with formulating seed mixtures and rates, contact the local MRCS if on private laced, BLM/[,*SFS if <br />on public sand or State Land Board if on state land. <br />A. Provide plant name and seeding rate <br />Plant Name Seeding Rate (P'LS/acxe) <br /> <br />~' . ~ ~o <br />? ~ ~. V /~ <br /> ~. <br />~ .Z ~O <br /> U. <br />r Q~+ <br />T - n.~ d ~ <br /> <br /> <br /> <br /> <br />B. Describe the method for seed bed preparation, and application method for grasslforb seeding: <br />I11~~'G ~'"H-,I, ~!`i~~ci~R 4JiXiui'Q.-B (~.`h/P.~i ~,~(,o21.r-.~ .S~l~c~) <br />V. TERMS AND CONDITIONS FOR PROSPECTING OPERATIONS: <br />i. Reclamation measures shall be fnffiilecl in a timely manner and completed within five (5) years of completion of prospecting <br />activities. <br />2. The prospecting operations described in this Notice will be conducted in such a manner as to minimize surface dist~ubances. <br />In addition to the measures required in Rule 3, precautions to be taker: include: <br />A. Confinement of operations to areas near e~cisting roads or ttat'ls, wluane practicable Existing roams which are to remain as <br />pem~nent roads after prospeding~;l, activities are co~letRd shall be kft in a conditioq equal to or bcuer than the pre- <br />Prospecting condition; <br />B. Drilling shall be conducted in such a way as fo Prevent cuttings aced fluids from directly euteria8 any dry ar flowing <br />stream channel Drill cuttings must be spread to a depth ao greatfr than one-half (l/2) inch or turfed in an approved <br />disposal pit; <br />