Laserfiche WebLink
NuvemCO, LLC Amendment <br />October Ore Pile Reclamation <br />M-2008-050 <br />Estimated boundary of <br />the historic camp at the <br />Nuvemco Orepile project <br />County Road <br />Top soil stockpile <br />Truck turn around <br />Approx 80ft x 60ft (0.11 ac) sweat lodge <br />ore pile <br />?C <br />estimated site boundary •?.' <br />1.7 acres <br />r <br />s <br />o <br />Figure 1: Truck Turn-Around (modified from BLM figure)