My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-30_PERMIT FILE - M2008050 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008050
>
2008-07-30_PERMIT FILE - M2008050 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:04 PM
Creation date
8/5/2008 9:47:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008050
IBM Index Class Name
PERMIT FILE
Doc Date
7/30/2008
Doc Name
Amendments
From
Nuvemco, LLC
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amended <br />October Ore Pile Reclamation <br />110(d) Limited Impact Permit Application <br />Nuvemco, LLC <br />Exhibit A <br />Rule 6: PERMIT APPLICATION EXHIBIT REQUIREMENTS <br />6.3.1 Exhibit A - Legal Description and Location Maps <br />Designated Mining Operation <br />Township 50 North, Range 19 West, Section 4, NW % SE %4 <br />New Mexico Principal Meridian <br />Parcel containing October Ore Pile is in the north half of October Claim No. 55, owned <br />by operator Nuvemco, LLC. <br />The area to be reclaimed pursuant to this permit application is a 0.35 acre parcel located <br />as follows. <br />Beginning at a point whence the Northeast corner of Section 8, Township 50 North, <br />Range 19 West, of the New Mexico Principal Meridian bears south 66 degrees, 24 <br />minutes, 53 seconds west, a distance of 3901.74 feet: <br />then east 174.38 feet; then south 87.79 feet; then west 174.38 feet; and then <br />north 87.79 feet more or less to the point of beginning; containing 0.35 acres <br />more or less. <br />Exhibit A. (see enclosed maps) <br />Map 1. Index Map - Gateway, Colorado to October Ore Pile <br />Adapted from USGS Gateway, Juanita Arch, Dolores Point North, and <br />Dolores Point South 7 % min quadrangle maps. <br />Map 2. Location Map - October Claims and Ore Pile Location <br />Locates permit area within Claim No. 55. <br />(NEW) Figure 1. Truck Turn-Around <br />3
The URL can be used to link to this page
Your browser does not support the video tag.