My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-01_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-08-01_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:16 PM
Creation date
8/1/2008 4:30:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
8/1/2008
Doc Name
Public Comment Letters
From
CC & V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Cripple Creek & Victor Gold Mining Company <br />A Joint Venture • ANGLOGOLD ASHANTI (COLORADO) CORP., Manager <br />V Operations Office <br />P.O. Box 191 • 100 North 3rd Street <br />Victor, Colorado 80860 <br />(7191689-2977 - Fax (719) 689-3254 <br />18 July, 2008 <br />Deborah Mariscano <br />District Manager <br />Park Center Water District <br />P.O. Box 1406 <br />Canon City, CO 81215 <br />Dear Ms. Mariscano: <br />Cripple Creek & Victor Gold Mining Company ("CC&V") is in receipt of your recent <br />"objection" letter of the Cresson Project Mine Life Extension project sent to the attention of the <br />Teller County Planning Commission. We were somewhat surprised by the tone and approach of <br />the letter as CC&V has voluntarily worked with Park Center Water District providing data <br />related to the flows of water from the Carlton Tunnel as well as information about the Cripple <br />Creek Mining District and surrounding areas. CC&V also has cooperatively worked with you on <br />the Fourmile Creek Water Quality Assessment and is working with Park Center Water District <br />on our ongoing mutual interest in finding a potential alternative water source for the Fourmile <br />Creek drainage. However, your recent letter to the Teller County Planning Commission as an <br />"objector" to the Cresson Project Mine Life Extension sets a different tone to our relationship <br />and requires this written response. <br />CC&V is meeting our responsibilities at the Carlton Tunnel, including the water quality <br />limitations stipulated in the Colorado Water Quality Control Division ("WQCD") discharge <br />permit for the flow of water from the Tunnel. As we previously described to your board, the <br />Carlton Tunnel drains a regional water table that includes the volcanic rocks in a general area <br />between the cities of Cripple Creek and Victor. The CC&V Cresson Project is a part of that <br />regional drainage area with any surface flows from the Project captured by on-site sediment <br />control ponds and any infiltrating water needing to traverse somewhere between 2,000 and 3,000 <br />feet of rock before reaching the regional ground water table. Realize, also, that the Carlton <br />Tunnel is some six or so miles distant from the Cresson Project area as the crow flies. Given <br />these and other factors, the WQCD has not classified the flow of water from the Carlton Tunnel <br />as mine drainage and that flow represents regional ground water that has been draining since <br />completion of the Tunnel in 1941. As noted in your letter, the quality of the water flowing from <br />the Carlton Tunnel has been relatively consistent since well before the Cresson Project started in <br />1994, including the sulfate levels that you note are of concern at the Park Center Water District
The URL can be used to link to this page
Your browser does not support the video tag.