Laserfiche WebLink
II- W1 Mine <br />Addendum to 2008 Rill & Gully Survey <br />Page 2 <br />4) Prepare a final report that will summarise the data obtained and present our conclusions and recommendations for stabilizing the <br />slope. The field work and reponpreparation will be conducted under the direct supervision of a registered professional engineer. <br />Schedule: <br />We (NWCC) can initiate the field investigation within 4 weeks of beinggiven notice to proceed. We anticipate that it will take Ito 2 <br />days to complete the excavation of the test pits and 2 to 4 days to complete the drilling. We anticipate that the final report should be <br />completed within 3 to S weeks after the laboratory investigation is completed It should be noted that it will take appmximately 2 to 4 <br />weeks to complete the laboratory testing. <br />The notice to proceed was issued on July 29, 2008. Once the report has been issued, SCC will review and determine <br />the appropriate plan of attack and construction schedule. <br />If there are questions or comments regarding this letter, please contact me at (970) 276-5217 or (970) 846-3648. <br />Sincerely <br />Roy A. Karo <br />Reclamation Manager <br />cc: Sandra Brown (DRMS) <br />Brian Dunfee (PIC) <br />Scott Belden (PIC)