Laserfiche WebLink
McClane Canyon Mining LLC <br />Water Sampling Report <br />Date: 6/26/08 <br />Weather Conditions: Clear, 95 degrees F. <br /> Surface Water <br />Sample <br />Point Time Flow <br />cfs pH EC <br />umhos/cm Temp (C) <br />SW-1 3:15 PM 4.00 8.6 1510 23.0 <br />SW-2 3:40 PM Dry - - - <br />SW-3 2:33 PM Dry - - - <br />SW-4 2:00 PM 0.4 8.5 2700 26.2 <br />SW-5 3:40 PM Dry - - - <br />SW-6 3:30 AM - Dry <br />- <br />- <br />- <br />SW-7 3:30 PM D - - - <br />SW-8 2:15 PM 3.00 8.6 1590 26.7 <br /> <br /> Ground Water <br />Sample <br />Point Time SWL <br />feet pH EC <br />umhos/cm Temp (C) <br />GW-1 3:02 PM 8.1 7.9 3100 17.8 <br />GW-3 2:27 PM 34.9 7.5 4100 17.6 <br />GW-6 2:45 PM Dry-18.8' <br />GW-9 3:32 PM 25.6 7.5 9700 15.3 <br />Location of Points[Wells <br />SW-1 East Salt Creek above McClane under haul road bridge <br />SW-2 McClane Creek at culvert below mine <br />SW-3 Munger Creek at haul road culvert below mine <br />SW-4 East Salt Creek -2 miles downstream of SW-8 <br />SW-5 McClane Creek above mine site at culvert inlet <br />SW-6 Munger Creek below mine before north split <br />SW-7 Munger Creek above Mine <br />SW-8 East Salt Creek between Munger and McClane Creeks at bridge <br />SW-X McClane Creek at confluence with East Salt Creek <br />Second Quarter 2008 <br />Sampled by: Jim Stover <br />Meters Calibrated: Yes <br />GW-1 Alluvium of East Salt Creek about 3 Miles above McClane - TD 14.3' <br />GW-3 Alluvium of East Salt Creek just below Munger Canyon - TD 47.3' <br />GW-6 In Munger Canyon at the permitted waste rock disposal area - TD 18.8' <br />GW-9 Alluvium of East Salt Creek below proposed waste rock disposal area - TD 53.5 <br /> Feet <br />GW-1 Total Depth 14.3 <br />GW-3 Total Depth 47.3 <br />GW-6 Total Depth 18.8 Depth revised when pipe was damaged <br /> during gob pile construction. <br />GW-9 Total Depth 53.5 <br />0 e' <br />2 m©a <br />000 <br />coo CIO <br />%re <br />