Laserfiche WebLink
....................................................................................................................................................................................................... <br />......:>:..,; 2 of :2 <br />RnAnARI F Ff3t]IPMFNT sheet <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-REEDRILL SKSAD, 7.0 in. $205.56 1 $205.56 $205.56 <br />-Water Tanker, 2,500 Gal. $56.94 1 $56.94 $56.94 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $262.49 $262.49 <br />............ :: ............................. <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Pueblo <br />Transportation Cycle Time : Non- Total one-way travel distance : 85.0 miles <br /> Roadable Roadable Average travel speed : 65.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 1.31 1.31 Total non-roadable mob/demob cost' : $695.58 <br />Return time (hours) = 1.31 1.31 * two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ** : $686.52 <br />Unloading time (hours) = 0.50 NA *• one round trip, no haul rig <br />Subtotals = 3.62 2.62 <br /> <br />.............. <br />JOB TIME AND COST .......................... ................................. ............................................................................................... <br />Total job time : ....... :::::......... <br />7.23 hours <br /> Total job cost : $1,382