Laserfiche WebLink
CIRCES Cost Estimating Software <br />BOREHOLE DESCRIPTION SEALING ITEM / METHOD DIAMETER LENGTH QUANTITY UNIT UNIT COST TOTAL COST <br />-Fill Holes with Cement Portland cement grout - 6 in. 6.25 7524 7,524.00 LF $2.07 $15,582.20 <br />-Borehole Marker Borehole marker NA NA 10.00 EA $2.17 $21.70 <br />-Borehole Plug PVC plug - 6 in. 6.25 NA 10.00 EA $125.50 $1,255.00 <br />-Drill Rig Time REEDRILL SK5AD, 7.0 in. NA NA 50.00 HR $196.79 $9,839.55 <br />-Water Truck Water Tanker, 2,500 Gal. NA NA 50.00 HR $68.45 $3,422.54 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />JOB COST Total Cost : $30,121