My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-28_REPORT - C1981012 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981012
>
2008-07-28_REPORT - C1981012 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:34:59 PM
Creation date
7/29/2008 12:59:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REPORT
Doc Date
7/28/2008
Doc Name
1st Quarter 2008 Wastebank Inspection Report
From
Peak Project Management, LLC
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Elk Mine <br />QUARTERLY COAL WASTE BANK INSPECTION REPORT <br />'CDMR Rules 4.69.1 (11) and 4.10.2(2) <br />Mine: NEW ELK <br />Waste Bank MSHA ID. No.: Primary Refuse Disposal Area (RDA) <br />Inspection Period: First Quarter 2008 <br />Inspection Date: '3/24/2008 <br />General Description or Reference to Site Plan: <br />The Refuse Disposal Area is located north of State Highway 12 and the Middle Fork of the <br />Purgatoire River. Refuse was transported from the preparation plant to the RDA by conveyor belt <br />The plant has been idle since March of 1996 at which time the last refuse was placed on the <br />fill area. <br />Activity During Inspection: <br />No activity occurred during the inspection. <br />Drainage; (Discussion of springs. seeps, overland and channel flow, underdrain construction and/ <br />or discharge, integrity of 100-year24fiour drainage structures, and evidence of positive drainage). <br />No springs or seeps were observed on the refuse side slopes. Positive drainage is established on <br />all areas. Vegetation is well established on previously reclaimed areas. <br />r <br />Observation of Fill Construction: (Description of material, compaction, lift thicknesses, slopes, <br />and construction methods). <br />Page 1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.