Laserfiche WebLink
TABLE 23 <br />SEDIMENT POND DIMENSIONS <br /> <br />?vz2 <br />yv?2 Pond No. <br />?3 <br />yv?? <br />Elevation of Upstream <br />Toe (Ft) 7,446.00 7,450.0 7,370.0 7,428 <br />Elevation of 3 Year <br />Sediment Volume (Ft) 7,448.03 7,453.0 7,371.3 7,438 <br />Elevation of 10 year <br />24 Hour Event (Ft) 7,449.95 7,456.0 7,378.2 7,451.75 <br />Elevation of Emergency <br />Spillway (Ft) 7,451.20 7,457.0 7,379.5 7,452.75 <br />Elevation of Top of <br />Structure (Ft) 7,452.00 7,459.0 7,381.5 7,459 <br />Elevation of Peak 25-year <br />24-hour Storm Flowing <br />at Design Depth 7,450.06 7,458.0 7,380.5 7,455.85 <br />Freeboard (Ft) Between <br /> <br />Dam Crest and 25-year v <br />24-Hour Storm Flowing at <br />Design Depth 1.94 1.00 1.00 3.25 <br />Width - Top of <br />Structure (Ft) 81 12.0 12.0 15 <br />Upstream Slope <br />of Embankment 1V:3.6H 1V: 2H 1V:2H 1V:3H <br />Downstream Slope <br />of Embankment 1V:3.8H 1V:3H IV:3H 1V:2.5H <br />Elevation of Top of <br />Primary Riser 7,450.57 7,378.5 7,451.75 <br />11995 Survey <br />21981 Survey <br />31985 As-Built <br />41984 As-Built <br />SDesign Depth of 0.5 PMP Storm <br />Note: Calculations for Ponds 004, 005, and 007 are shown in <br />Exhibit 19. Design for Pond 008 are provided in Exhibit 20.' <br />Pond 006 is now a process pond. <br />2.05-16 (revised 8/29/97)