Laserfiche WebLink
ANNUAL SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(15) <br />Mine: New Elk <br />NPDES ID. No.: None (Plant Overflow - Pond 6) <br />Inspection Period: Second Quarter 2008 <br />Inspection Date: 06/30/08 <br />General Description or Reference to Site Plan: <br />This pond receives overflow from the Preparation Plant and is a polishing pond for the sewage <br />treatment plant. This facilities are currently out of service. Pond 6 is occasionally used to dewater <br />other ponds for tp facilitate cleanout <br />EMBANKMENT <br />1). Adequacy of the vegetative cover. <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />Excellent Moderate Few <br />Extensive Some ew <br />4). Erosion of the downstream toe of the embankment? <br />Cause of erosion can be attributed to: <br />Yes <br />Yes <br />Poor <br />None <br />No <br />No l/ <br />5). Is seepage occurring through the dam? <br />Could this seepage cause potential instability? <br />Yes No /.-- <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design st rage caps it of the reservoir been surpassed? <br />lr cc <br />Elevation @ top of. <br />Elevation of Water Surface: <br />Elevation to top of Sediment <br /> <br />No <br />Page 1 <br />7f z;ld <br />Date Date -