Laserfiche WebLink
MINE ID # OR PROSPECTING ID#: M-1977-493 PAGE: 2 <br />INSPECTION DATE: 9-26-07 INSPECTOR'S INITIALS: ACS <br />OBSERVATIONS <br />Arkansas Lake Area <br />The Arkansas Lake area is a reclaimed gravel pit in the Arkansas River <br />floodplain located in Lake County at the southwest end of the Climax <br />property. At the time of this inspection, civil works to upgrade-the <br />Arkansas Lake Dam were underway. These consisted of the construction <br />of a two-foot lift to the crest of the dam and improvements to the <br />Arkansas Well, a source of fresh water to Climax Camp. Borrow fill for <br />the dam raise was being sourced from an excavation immediately adjacent <br />to a longstanding topsoil stockpile. Climax had marked and signed the <br />topsoil pile to avoid inadvertent disturbance by the contractor. The <br />borrow excavation and the topsoil stockpile were inspected and it was <br />determined that the topsoil was being properly preserved. The design <br />outslope of the raised dam is 2.5:1. <br />A utility line servicing the Arkansas Well located south of Highway 91 <br />had been abandoned and replaced by a new line located north of the <br />highway. There was a discussion of reclamation requirements for the <br />abandoned utility line, and it was agreed that the Division would <br />complete a review of the permit file in that regard. The Division has <br />determined that the area where the abandoned line is located was <br />included in the area of affected lands as defined in the original 1977 <br />permit and is within the private land owned by Climax Molybdenum <br />Company. With approval of the 1989 permit amendment (amendment AM-02) <br />and subsequent permit amendments, the location of the abandoned line <br />was excluded from the defined area of affected lands. It is important <br />to note that although the area where the abandoned line is located was <br />within the original permit's defined area of affected lands, the line <br />was not depicted on the original maps. The abandoned line meets the <br />definition of affected land, does not serve any beneficial post mining <br />land use, and therefore must be reclaimed. Reclamation would include <br />removal of structures and revegetation. This area to be reclaimed can <br />be re-included into the area of affected lands through the forthcoming <br />permit amendment to be submitted in support of the mine reopening. <br />Storke Yard Arkansas River Reclamation <br />During 2007, Climax embarked on a major reclamation project to daylight <br />the Arkansas River through the Storke Yard. The river has been passed <br />through a culvert for the past several decades. The design for the <br />day-lighted river had been vetted by both the Division and the Army <br />Corps of Engineers. The design includes flood routing, water flow <br />energy dissipation, and riparian zone revegetation using native plant <br />species and composted biosolids. Based on observations made during <br />this inspection and as illustrated in the photographs included with <br />this report, the Division believes this to be a superior reclamation <br />effort, and looks forward to and anticipates that with ongoing <br />maintenance and monitoring this project will develop into a viable