My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-24_PERMIT FILE - M2008009 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008009
>
2008-07-24_PERMIT FILE - M2008009 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:34:55 PM
Creation date
7/25/2008 1:51:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008009
IBM Index Class Name
PERMIT FILE
Doc Date
7/24/2008
Doc Name
Follow-up to 07/16/2008 memo
From
Water Resources Consultants, LLC
To
DRMS
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />WATER RESOURCE CONSULTANTS, LLC <br />RECEIVED <br />July 23, 2008 <br />Mr. Steve Baker <br />3B Enterprises, LLC <br />POB 1665 <br />Craig, CO 81626 <br />RECEIVED <br />JUL 2 4 2008 <br />GRAND JUNCTION MELD OFFICE <br />DIVISION OF <br />RECLAMATION MINING & SAFETY <br />JUL 2 5 2008 <br />Division of Reclamation, <br />Mining and Safety <br />via e-mail and First Class Mail <br />Mr. Travis Marshall via FAX and First Class Mail <br />Dept. of Natural Resources <br />Division of Reclamation, Mining and Safety <br />101 South 3rd Street, Suite 301 <br />Grand Junction, CO 81501 <br />RE: Lyster Pit, 112 Permit Application, Craig, CO. <br />Water Resources Evaluation - <br />Follow-up to July 16, 2008 memo to Travis Marshall from Kate Pickford <br />Steve and Travis, <br />This letter is a follow-up to our letters of July 3, 15 and 18, 2008, and specifically replies to the, <br />Division's memo of July 16, 2008 from Kate Pickford to Travis Marshall, and Kate's response to <br />our July 18, 2008 letter. This letter is the same as sent July 18, 2008, except that Paragraph 4 <br />has been added at the end of the letter. <br />1. Monitoring Plan. <br />a. Baseline time period. We propose monitoring groundwater elevations in the <br />monitoring wells during the baseline period at least twice per month from the time of <br />installation until at least December, 2008 (assuming wells get installed in July or <br />August of this year). Monitoring the wells 2x per month will provide more of a <br />response to irrigation than monitoring only 1x per month. Monitoring shall include <br />observations of groundwater levels below the top of casing, the height of the casing <br />above the ground level, and shall be reported as actual elevations from a bench mark <br />of known elevation. Additionally, site conditions shall be noted, such as irrigation) <br />practices, snow cover, snow melt, rainfall, and the condition or operation of nearby <br />irrigation ditches, e.g., either dry or running water etc. <br />b. Pit Operation. Water levels in monitoring wells shall be monitored once per month <br />during any time the pit is actively pumping water from or needing to dewater the' <br />workings in the pit. Observations shall be recorded on the same log sheets used <br />during the baseline monitoring. <br />244 Hutton Ave., Rifle, CO 81650 PH / Fax (970) 625-5433 pcurrier@wrc-Ilc.com
The URL can be used to link to this page
Your browser does not support the video tag.