My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 7/25/2008, 10:58:57 AM-MR1
DRMS
>
Public
>
PERMIT FILE - 7/25/2008, 10:58:57 AM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:40 PM
Creation date
7/25/2008 12:25:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008022
IBM Index Class Name
PERMIT FILE
Doc Date
7/22/2008
Doc Name
Reclamation Liability Estimate
From
DRMS
To
Buys & Associates, Inc.
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />WHEEL LOADER - LOAD AND CARRY WORK <br />PROJECT IDENTIFICATION <br />Task #: 02a State :Colorado Permit/job #: P-2008-022 <br />Date : 0712212008 County : Montrose Abbreviation :none <br />User : GRM Site : Vex Claims Filename : P022-02a <br /> <br />Agency or organization name : DRMS <br />Permit or other job action :Final Reclamation Liability Estimate <br />Task description :misc. earthwork @ pads and reclamation <br />HOURLY EQUIPMENT COST Basic machine : CAT246 (2004) Horsepower : 74 <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $5.55 NA <br />Operating cost/hour: $13.60 100 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $51.93 Total fleet cost/hour : $51.93 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume : 300 LCY factor : NA volume : 300 LCY <br />Source of quantity take-off : estimated from plans <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION (Cat HB) <br />Loader Cycle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.425 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material : No adjustment - factor not applicable 0.000 (Cat HB) <br />Stockpile : No adjustment - factor not applicable 0.000 (Cat HB) <br />Truck ownership : No adjustment - factor not applicable 0.000 (Cat HB) <br />Operation : Inconsistent operation 0.040 (Cat 118) <br />Dump target : Fragile target 0.050 (Cat HB) <br />Net cycle time adjustment : 0.090 minutes <br />Adjusted basic cycle time : 0.515 minutes <br />Rolling Resistance - Road Conditions <br />Haul :Rutted dirt, little maintenance, no water, 2" tire penetration <br />Return :Rutted dirt, little maintenance, no water, 2" tire penetration <br />Haul and Return Time Length <br />(feet) Grade res. <br />(%) Rolling res. <br />(%) Total res. <br />(%) Travel time <br />(minutes) Data <br />Source <br />Haul route : 100 10.00 5.00 15.00 0.1563 (Cat HB) <br />Return route : 100 -10.00 5.00 -5.00 0.0705 (Cat HB) <br /> Total travel time : 0.2268 minutes <br />Loader Bucket Capacity Total cycle time : 0.742 minutes <br />Rated capacity : 0.53 LCY (heaped) (Cat HB) <br />Bucket fill factor : 0.900 Other - soil, boulders, roots (80 -100%) <br />Adjusted capacity : 0.48 LCY <br /> Source <br />Job Condition Correction Factors Altitude adjustment factor : 0.97 (Cat HB) <br />Site altitude : 7,100 feet Job efficiency factor : 0.83 (1 shift/day) <br /> Net correction : 0.81 multiplier <br />Unadjusted hourly unit production : 38.58 LCY/Hr <br />Adjusted hourly unit production : 31.06 LCY/Hr (Cat HB) <br />Adjusted hourly fleet production : 31.06 LCY/Hr <br /> <br />JOB TIME AND COST i <br />Fleet size : 1 Loader(s) Total job time : 9.65 Hours <br />Unit cost : $1.672 /LCY Total job cost : $502
The URL can be used to link to this page
Your browser does not support the video tag.