Laserfiche WebLink
i <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description Cost/hour/unit (No. units) Cost/hr/fleet Cost/hr/fleet <br /> <br />-Light Duty Pickup, 4x4, 314 T. $30.93 1 $30.93 $30.93 <br /> <br /> I <br /> <br /> I <br /> i <br /> <br /> <br /> <br /> <br /> <br /> I <br /> <br />-- I <br />Subtotals : $30.93 $30.93 <br /> <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Naturita <br />Transportation Cycle Time : Non- Total one-way travel distance : 10.0 miles <br /> Roadable Roadable Average travel speed : 40.0 mph' <br /> Equipment Equipment <br />Haul time (hours) = 0.25 0.25 Total non-roadable mob/demob cost $279.89 <br />Return time (hours) = 0.25 0.25 " two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost $15.47 <br />Unloading time (hours) = 0.50 NA one round trip, no haul rig <br />Subtotals = 1.50 0.50 <br />JOB TIME AND COST Total job time : 3.00 hours <br /> Total job cost : $295