Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />: <br />....... ..::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::.:::::::::::::::::::::::::::.::::::::::::::::::::::::::: •>:•;:;;.;:.;:.;:.;:.;:.;:.;:.;:. <br />FICA. . .::.. .............................. <br />.................................................................................................................................................................................... <br />O.N :. <br />PROJECT IDENTIFICATION <br />Task #: 004 State : Colorado Permit/job# : M-2007-087 <br />Date <br />User <br />07/03/2008 <br />DB2 <br />County :Adams <br />Site : Priola <br />Abbreviation :none <br />Filename : M087-004 <br />Agency or organization name : DRMS <br />Permit or other job action :New 112 <br />Task description : Spread topsoil <br />:;;;;;:.; ....................................................................................................................................... <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11- 8U (2005) Horsepower : 310 <br />Blade type : Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $57.40 NA <br />Operating cost/hour : $77.43 100 <br />Ripper op. cost/hour : $1.01 15 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $168.61 Total fleet cost/hour : $168.61 <br />MATERIAL UANTITI ES ::::::............................................................. <br /> <br />Q ............................... <br />....................................:...:.:...:.:..::..:::::::.:..:::::: <br />.................................................................................................... <br />Initial Swell Loose <br />volume : 15,600 LCY factor : NA volume : 15,600 LCY <br />Source of estimated volume :Pemtit <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 200 feet <br />Unadjusted hourly production : 515.8 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Top Soil <br />0.01 % (neg) <br />5.100 feet <br />1.600 Ibs/LCY <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Unit cost : $0.435 /LCY <br />Job Condition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.20 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1shift1da) <br />Spoil pile : 0.70 (fnd-mo <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 1.44 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.75 <br />Adjusted unit production : 387.25 LCY/hr <br />Adjusted fleet production : 387.25 LCY/hr <br />Total job time : 40.28 Hours <br />Total job cost : $6,792