Laserfiche WebLink
sheet 1 of 2 <br />Permit or other job action :New 112 Application <br />Task description : Backfill pit with imported material <br />HOURLY EQUIPMENT :COST Shift basis : 1 perday <br />Description <br />Truck/loader team -Truck : Generic 10-12 cy, 6x4 <br />-Loader :ICAT 950G high lift (2002) <br />Support equipment -Load area : NA <br />-Dump area :I Cat D7R DS Series 11 LGP - 7S <br />Road maintenance -Motor grader <br />-Water truck <br />Tanker. 2.500 Gal. <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA dozer NA misctruk <br />% Utilization-machine : 79 100 NA 100 NA 33 <br />-Ripper attachment : NA NA NA 10 NA NA <br />Ownership cost/hour : $12.32 $21.07 NA $45.54 NA $7.53 <br />Operating cost/hour : $34.75 $30.76 NA $60.04 NA $5.09 <br />Ripper op. cost/hour : NA NA NA $0.00 NA $0.00 <br />Operator cost/hour : $24.14 $32.78 NA $32.78 NA $33.94 <br />Unit subtotals : $71.21 $84.61 NA $138.36 NA $46.56 <br />Number of units : 4 2 0 1 0 1 <br />Group subtotals : Work : $454.06 Support : $138.36 Maintenance : $46.56 <br />Total work team cost/hour : $638.99 <br />.. <br />: <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 91,650 CCY factor : 1.215 volume : 111,355 LCY <br />Material weight : 3,300 pounds/LCY Struck volume : <br />Descr.: Decomposed rock - 75% Rock, 25% Earth Heaped volume : <br />Rated payload <br />Payload capacity <br />35,400 pounds Average volume : <br />10.73 LCY Adjusted volume*: <br />Final truck volume based on number of loader passes : <br />truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Caaacity : Job Condition Correctiol <br />Rated capacity (nom. heaped) : 3.750 LCY Truck <br />Descr.: Blasted rock - poorly blasted (60 - 7596) Altitude adj.: 1.000 <br />Bucket fill factor : 0.675 Job efficiency : 0.950 <br />Adjusted bucket capacity : 2.531 LCY Net correction : 0.950 <br />10.00 LCY <br />12.00 LCY <br />11.00 LCY <br />10.73 LCY <br />10.12 LCY <br />Site altitude ft): 5,100 <br />Loader Source <br />1.000 (Cat HS <br />0.950 _ <br />(user) <br />0.950