Laserfiche WebLink
Robinson Brick Company is filing this Annual Report providing a Notice of Intent to <br />Continue Mining Operations at Buffalo Mine located in Elbert County, Colorado. The <br />mine has a phased reclamation plan. <br />Operations (Current Year) <br />Mining operations continue in accordance with the mine plan. The permitted acreage <br />was reduced to approximately 210 acres through the release of 144.5 acres in Phases 1, 11, <br />and V. The maximum allowable disturbed acreage remains at 30 acres. Current <br />disturbance is approximately 8.6 acres in Phase 111. No additional acres were disturbed <br />this period. No additional acres were reclaimed during this reporting period. <br />Operations (Next Year) <br />Mining operations in 2008-2,009 will disturb no additional acres., <br />Bonding <br />Deemed adequate at this time.