My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-04-25_GENERAL DOCUMENTS - C1984065
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1984065
>
2001-04-25_GENERAL DOCUMENTS - C1984065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2021 1:47:30 PM
Creation date
7/23/2008 2:24:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
4/25/2001
Doc Name
PKA-1-1090
From
DRMS
To
New Castle Subsidence Reclamation Project Bidders
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources <br /> 1313 Sherman St.,Room 215 <br /> Denver,Colorado 80203 ADIVISION O F <br /> Phone:(303)866-3567 MINE RAL S <br /> FAX:(303)832-8106 & <br /> GEOLOGY <br /> DATE: A ri125 2001 R E C L A M A T I O N <br /> P MINING•SAFETY <br /> TO: New Castle Subsidence Reclamation Project Bidders Bill Owens <br /> Governor <br /> Gre E.Watcher <br /> FROM: Steve Renner Executive Director <br /> Michael B.Long <br /> RE: Amendment No. 1 Division Director <br /> Thank you for attending the pre-bid meeting on April 24, 2001. A revised Bid Scheduled and a <br /> copy of the attendance list are attached. Please note the following clarifications and amendments <br /> to the New Castle Subsidence Reclamation Project Documented Quote Bid: <br /> 1. The Sample Letter of Agreement between CONTRACTOR and Excel Energy (Public Service <br /> Company of Colorado) was distributed at the Pre-Bid Meeting. If you did not receive a copy <br /> of the Agreement, please contact me at (970) 241-0336. <br /> 2. Project Dates: The Project is scheduled to begin on May 21, 2001, and end on May 31, 2001. <br /> The time of completion is eleven (11) calendar days. <br /> 3. Task 2; Backfill Subsidence Feature: The following supercedes the Installation <br /> Specifications contained in the Documented Quote dated April 3, 2001. (NOTE that the <br /> other sections of Task 2; "General Description, Materials, Testing, Safety" have not been <br /> changed.) <br /> Installation Specifications <br /> Backfill materials will be introduced into the feature in stages in order to construct the closure: <br /> The first stage will involve introduction of fly ash grout into the vents located adjacent to the <br /> west wall of the feature. Fly ash grout will be introduced into these vents to refusal. It is <br /> estimated that fifteen cubic yards (15 yd3) of grout will be consumed in this first stage. Filling of <br /> the vents to refusal will result in solidified fly ash grout being present at the top of the vents <br /> within the feature. <br /> The second stage of fly ash grout introduction will fill the depression which exists immediately <br /> overlying the top of the vents within the feature, and adjacent to the west wall of the feature. <br /> This depression measures eight feet (8')by fourteen feet (14')by four feet (4') in depth. The <br /> estimated volume of fly ash grout to be introduced into the depression is seventeen cubic yards <br /> (17 yd3)• <br />
The URL can be used to link to this page
Your browser does not support the video tag.