Laserfiche WebLink
• r <br /> � II <br /> REVISED BID SCHEDULE <br /> HAWKS NEST MINE MAINTENANCE PROJECT <br /> PKA-0-451 <br /> Item Description Quantity Unit Unit Price Amount <br /> I Mobilization/ <br /> Demobilization N/A Job N/A $ 4500.00 <br /> 2 Surface Preparation N/A Job $ 10124,00 $ 10124.00 <br /> 3 Topsoil Application N/A Job N/A $28320_pp <br /> 4 Surface Roughening N/A Job N/A $ �i E4 01L <br /> Ln. <br /> 5 Channel Construction 300 Ft- $ 19.36 $ 5808.00 <br /> 6 Revegetation 8 Ac. $1 090.00 $ .8720.00 <br /> 7 Mine Opening " N/A Job DELETED DELETED <br /> Backfill <br /> ' 8 P <br /> u E9i ment Rental <br /> A Dozer 16 Hour $ 70.00 $tea-20,r60 <br /> B Backhoe 12 Hour $ 50.00 $ 600.00 <br /> C End Dump Truck 8 Hour $ 50.00 $ 400.00 <br /> 9 Post Construction 1,500 Ln. $ 2.50 $ 3250AD 3 73 <br /> Sedin er Control- <br /> 10 Supply Topsoil 3,225 Cu. $ 16.00 51600.00 <br /> Yd. $ <br /> 11 Supply Manure 8 Acre $ 230.00 $ 1840.00 <br /> GRAND TOTAL g-18-,442=00— <br />