Laserfiche WebLink
BID No. PKA-0-451 Hawk's Nest Mine Maint <br /> CONTRACT# VENDOR: Charles Sickles Construction <br /> BID SCHEDULE <br /> ITEM DESCRIPTION OTY. UNIT UNIT PRICE BID AMOUNT <br /> 1 Mob/Demob N/A JOB N/A $4,500.00 <br /> 2 Surface Preparation N/A JOB $ 10,124.00 $10,124.00 <br /> 3 Topsoil Application N/A JOB N/A $ 28,320.00 <br /> 4 Surface Roughening N/A JOB N/A $ 2,160.00 <br /> 5 Channel Construction 300 Ln. Ft. $ 19.36 $ 5,808.00 <br /> 6 Revegetation 8 Ac. $ 1,090.00 $ 8,720.00 <br /> 7 Deleted 1 JOB $ - $ <br /> 8a Dozer 16 Hrs. $ 70.00 $ 1,120.00 <br /> 8b Backhoe 12 Hrs. $ 50.00 $ 600.00 <br /> 8c End Dump Truck 8 Hrs. $ 50.00 $ 400.00 <br /> 9 Post Const. Sediment Contr 1,500 Ln. Ft. $ 2.50 $ 3,750.00 <br /> 10 Supply Topsoil 3,225 Cu. Yds. $ 16.00 $ 51,600.00 <br /> 11 Supply Manure 8 Ac. $ 230.00 $ 1,840.00 <br /> BID RECAP $ - <br /> j $ _ <br /> $ - Bid <br /> $ - Bond Amt. <br /> GRAND TOTAL BID $118,942.00 $ 5,947.10 <br />