Laserfiche WebLink
Ij <br />HAWKS NEST MINE MAINTENANCE PROJECT <br />PKA-0-451 <br />BID SCHEDULE <br />Item Description Quantity Unit Unit Price Amount <br />1 Mobilization/ <br />Demobilization <br />N/A <br />Job <br />N/A <br />$ <br />2 Surface Preparation ,,N/A Job $ $ <br />3 Topsoil Application N/A Job N/A $ <br />4 Surface Roughening N/A Job N/A $ <br />5 Channel Construction 300 Ln. Ft. $ $ <br />6 Revegetation 8 Ac. $ $ <br />7 Mine Opening Backfill N/A Job N/A $ <br />8 Equipment Rental <br />A Dozer 16 Hour $ $ <br />B Backhoe 12 Hour <br />C End Dump <br />Truck <br />8 <br />Hour <br />$ <br />$ <br />9 Post Construction <br />Sediment Control <br />1,500 <br />Ln. Ft. <br />$ <br />$ <br />10 Supply Topsoil 3,225 Cu. Yd. $ $ <br />11 Supply Manure 8 Acre $ $ <br /> GRAND TOTAL $