Laserfiche WebLink
Article 26. PROTECTION OF WORK AND PROPERTY <br />The Contractor shall continuously maintain adequate protection of all his work and materials, protect the <br />property from injury or loss arising in connection with the Contract and adequately protect adjacent property <br />as provided by law and the Contract Documents. <br />The Contractor shall make good any damage, injury or loss, except such as may be: <br />(a) Directly due to errors in the Contract Documents; <br />(b) Caused by agents or employees of the Principle Representative; <br />(c) Due to causes beyond the Contractor's control and not to his fault or negligence. <br />The Contractor shall take all necessary precautions for the safety of employees on the work, and shall <br />comply with all applicable provisions of Federal, State and Municipal safety laws and building codes to <br />prevent accidents or injury to persons on, about or adjacent to the premises where the work is being <br />performed. He shall erect and properly maintain at all times, as required by the conditions and progress of <br />the work, all necessary safeguards for the protection of workmen and the public and shall post danger signs <br />warning against the hazards created by such features of construction. <br />The Contractor shall take due precautions when obstructing sidewalks, streets or other public ways in any <br />manner, and shall provide, erect and maintain barricades, temporary walkways, roadways, trench covers, <br />colored lights or danger signals and any other devices <br />necessary to assure the safe passage of pedestrians and automobiles. <br />In an emergency affecting the safety of fife or posing a threat to adjoining property, the Contractor, without <br />special instruction or authorization from the Project Manager or Principal Representative, is hereby permitted <br />to act, at his discretion, to prevent such threatened loss or injury; and he shall so act, without appeal, if so <br />authorized or instructed. The Principle Representative must be notified as soon as possible in the event of <br />any emergency. Any compensation, claimed by the Contractor on account of emergency work, shall be <br />determined by agreement for extra compensation. <br />Article 27. HISTORICAL PRESERVATION <br />Areas adjacent to the mine sites often contain related artifacts and structures, such as buildings, tipples, ore <br />houses, headframes and foundations, that may be historically significant. Care shall be exercised to avoid <br />any disturbances to these structures and artifacts, in order to preserve their integrity. Existing structures <br />shall not be used as load-bearing devices. <br />Article 28. ELECTRICAL POWER, POTABLE AND CONSTRUCTION WATER <br />The Contractor shall be responsible for providing electrical power and potable and construction water as <br />needed to perform the contract work. If the Contractor desires to use power other than portable generators, <br />the Contractor's plans for providing such power will be subject to the Principle Representative's prior <br />approval. The cost for providing power and water will not be paid for separately but shall be included in the <br />bid prices of the various work items. The Contractor shall install and maintain all utilities in such manner <br />as to protect the public and workmen and conform with any applicable laws and regulations.. Upon <br />completion of the work he shall remove all such temporary utilities from the site. <br />Article 29. PROTECTION OF EXISTING UTILITIES <br />Utilities, both underground and above-ground, may exist which could affect construction work covered under <br />this contract. The Contractor is responsible for determining the nature and locations of any and all utilities <br />which could affect construction work covered under this contract. The horizontal and vertical locations of <br />utilities may vary. The Contractor is responsible for excavation and equipment movement without damage <br />to utilities. The Contractor assumes all responsibility for damages to any utilities he causes under this <br />contract. <br />Colorado Division of Minerals & Geology GENERAL BID SPECIFICATIONS <br />1996 Page 10