My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-02-17_GENERAL DOCUMENTS - C1981015 (5)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981015
>
2000-02-17_GENERAL DOCUMENTS - C1981015 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2021 7:05:37 PM
Creation date
7/23/2008 12:35:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981015
IBM Index Class Name
General Documents
Doc Date
2/17/2000
Doc Name
PKA-0-455
From
DRMS
To
All Contractors
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources <br /> 1313 Sherman St.,Room 215 tM1 <br /> I S I ON OF <br /> Denver,Colorado 80203 <br /> Phone:(303)866-3567 N E RA L S <br /> FAX:(303)832-8106 & <br /> GEOLOGY <br /> RECLAMATION <br /> MINING•SAFETY <br /> Bill Owens <br /> Governor <br /> Greg E.Walcher <br /> DATE: February 17,2000 Executive Director <br /> Michael B.Long <br /> TO: ALL CONTRACTORS BIDDING ON THE FRUITA MINE/AMERICAN SHIELD BOND Division Director <br /> FORFEITURE <br /> FROM: PAUL KRABACHER,PROJECT MANAGER <br /> PHONE 970-248-7253 <br /> RE: AMENDMENT No. 1 TO PKA-0-455 <br /> I would like to thank-you all for attending the pre-bid meeting held today for the Fruita Mine bond forfeiture site. <br /> Below are the changes or additions to the bid. <br /> The Bid Document should be FRUITA MINE/AMERICAN SHIELD BOND FORFEITURE/C-81-015 <br /> not M-81-015 <br /> 1. Enclosed is a site map of the proposed work for bid. Also enclosed is a post reclamation map showing existing <br /> contours WITHOUT the developed gulley and associated deposition resulting from the 1999 flood. <br /> 2. The project Time of Completion has been extended to 35 calendar days after the receipt of the Notice to Proceed <br /> with project work scheduled to commence April 3,2000. <br /> 3. All terms and conditions of the Invitation and Bid other than as changed by Amendment No. 1 and this <br /> amendment remain the same. <br /> 4. Receipt and acceptance of this amendment will be acknowledged by returning the Receipt and acceptance of <br /> Amendment 1 to PKA-0-455 sheet attached. <br /> M:\imp\KRH\AMENDME.NTS\FRUITA.PK.doc <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.