My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-02-16_GENERAL DOCUMENTS - C1981037
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981037
>
1996-02-16_GENERAL DOCUMENTS - C1981037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2021 4:10:44 PM
Creation date
7/23/2008 10:00:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/16/1996
Doc Name
PKA-6-1010
From
DRMS
To
All Bidders
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5TATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources <br /> 1 313 Sherman St., Room 215 <br /> Denver,Colorado 80203 <br /> Phone:(303)866-3567 <br /> FAX:(303)832-8106 <br /> DEPARTMENT OF <br /> NATURAL <br /> DATE: February 16, 1996 RESOURCES <br /> Roy Romer <br /> TO: All Bidders on the GEC/East Pit Maintenance Project Governor <br /> James S.Lochhead <br /> Executive Director <br /> FROM: John Nelson, Division of Minerals and Geology Michael B.Long <br /> Division Director <br /> RE: Amendment #1 to PKA-6-1010 <br /> Thank you for attending the pre-bid meeting on February 15, 1996. The following clarifications <br /> and amendments should be noted and incorporated into the special conditions and project work <br /> description. <br /> Special Conditions <br /> 1. Time of Completion: The time of completion for this project is 20 working days after <br /> receipt of the Notice to Proceed. This includes five (5) days mobilization time. <br /> 2. Project Date: The date for scheduled construction is between March 11, 1996 and <br /> April 5, 1996. <br /> Project Work Description <br /> The individual work descriptions of the bid document are modified to the extent outlined below. <br /> Item 1. Chen's Hill ditch, uphill from the gate will be constructed "to fit between the hill <br /> and road", which will be as wide as possible, but not as wide at the 10 ft. x 3 ft. <br /> V-ditch shown in Drawing 1. <br /> Item 4. From the rocked berm, a 4 ft. wide x 2 1/2 deep ditch will be constructed along <br /> the old road toward the 1st drop structure, for a distance of (50) fifty feet. <br /> Item 6. The area below the road crossing shall be graded prior to riprap installation. <br /> Item 8. The East Pit property gate will be replaced (6-rail, 14 ft. long). <br /> All riprap will be 1 foot thick, except at the East Pit road crossing #7, where it will be 2 feet <br /> thick. <br /> Large riprap located immediately west of the East Pit crossing is being reserved for future work <br /> and may not be used for this project. <br /> m:\imp\yjb\gec.amd <br /> U <br />
The URL can be used to link to this page
Your browser does not support the video tag.