Laserfiche WebLink
Project: <br />• ' GEOTECH <br />; Client / On Site Rep: <br />Bowie Resources / B. Bear <br /> <br />Bowie Mine Gob Pile Stability Civil, Structural & Geoiechnica! Engineers <br />CO 81401 <br />222 South Park Ave <br />- Montrose Contractor / Rep: <br />Load Out Services / S. Weft <br />Project No: <br />2005126-CMT Date: <br />4/15/2008 . <br />. <br />Ph.: (970) 249-6828 • FAX: (970) 249-0945 <br />CONSTRUCTION MATERIALS TESTING LABORATORY Technician: <br />R. Wilson <br />DAILY COMPACTIO N REPORT <br /> TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PERCENT NOT SOIL LAB SAMPLE <br />ETEM17 <br />ER LOCATION <br />Gob Embankmen# GRADE ELEV NUC SAND DENSITY <br />(pcf) MOISTURE <br />CONT. (%) DENSITY <br />(pcf) CONTENT <br />(%) COMPACTION wrrHlN <br />SPEC TYPE NUMBER <br /> (PT#4336) N19496.691/E36667.321 6185.9 X 91.3 9.0 88.2 9.3 96.6 ob 4230/31 r/c @26% <br />B Retest of test Nos. 203 A and 203 6193.0 X 90.0 10.0 87.2 9.7 96.9 gob 4230/31 r/c @15% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE / DENSITY SPECIFICATIONS OBSE RVATION / TESTING FIELD OBSERVATIONS <br />Specified Date: Compaction Equipment Used: <br />Compaction 900/0 + Cohesive Soils X <br />Requirement: Cohesionless Soils Full Time: Day: <br />S M T <br />X W Th F S <br />Sheepsfoot: F --X l <br /> Part Time: Weather: Sun Clear Overcast Rain Snow <br />Specified x X Smooth Drum Roller: <br />Moisture N/A Cohesive Soils X <br />Requirement: Cohesionless Soils Number of Site Visits/Day: Temp: To 32 32-50 50-70 <br />X 70-85 85 Up <br />Vibratory: <br /> Testing Only: A Wind: Still Mod High <br /> Requested By (Company Name): X X Other (List Below): <br />Laboratory Testing ASTM-698 Cohesive Soils X <br />Procedure: <br />Cohesionless Soils S. West / Load Out Services Humidity: Dry <br /> <br />X Mod Humid <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: Insufficient amount <br />lof material placed. Informed (Rep of Company) of Test Results: <br />S. West / <br />T3u was not informed prior <br />it <br />that th <br />i <br />l <br />t <br />n <br />Contractor Not Working Due To: The Contractor Is: Load Out Services o o our our arr <br />va <br />e <br />s <br />e <br />o <br />contractor would not be working <br /> <br />Inclement Weather: <br /> <br />Equipment Malfunction: <br />Processing Frozen Material; Processing wet material: <br /> <br />Stripping and/or Grabbing: Moisture Conditioning Dry Mat'I: Field Copies Given To: <br /> <br />Contractor: <br />Client: on this date. <br /> <br />Unknown: <br />Stockpiling Fill: Removing Unsuitable Mat'I: CM/GM: <br />Other: PAGE 1 OF 1 <br />05-126-CMT Bowie Mine Gob Pile Stability.xis DCR4-15-08#207-ap/sj