Laserfiche WebLink
PROJECT WORK DESCRIPTION <br /> The following tables contain basic information and work descriptions for each of the hazardous <br /> mine openings to be safeguarded in this project and other project work as described. When <br /> reference is given, please refer to the Colorado Inactive Mine Reclamation Program General Bid <br /> Specifications 1996 for details of the Standard Work Specifications (SWS) and Standard Drawing <br /> Descriptions necessary to complete this project. <br /> ITEM 1- MOBILIZATION/DEMOBILIZATION <br /> Mobilization <br /> This task includes moving equipment and supplies to the project area. If desired, the <br /> CONTRACTOR may establish a staging area for the storage of all equipment and supplies. The <br /> area shall be of adequate size to accommodate all of the CONTRACTOR'S vehicles, equipment, <br /> and supplies and shall be approved by the PROJECT MANAGER. The CONTRACTOR shall <br /> minimize impact on the staging area with regard to noise, dust, and fumes. The CONTRACTOR <br /> shall be responsible for maintaining security of the staging area. <br /> This task also includes all labor and costs associated with locating and protecting utilities, both <br /> above ground and underground, at the work site. <br /> The CONTRACTOR shall exercise caution during mobilization, performance of all work tasks, and <br /> demobilization in order to avoid damage to public and private property including, but not limited to, <br /> pavements, soils, vegetation, water supplies, fences, walls, structures, existing sediment ponds, <br /> landscaping etc. The CONTRACTOR shall repair and restore public or private property damaged <br /> during the work at his expense. See also Section 1.0 of the "Standard Work Specifications" <br /> included in CDMG General Bid Specifications, 1996. <br /> Demobilization <br /> This item shall include all labor, equipment, and costs associated with demobilization and clean-up <br /> of the work site to its original or better condition. All equipment and supplies, materials, and debris <br /> related to this project will be removed from the site upon completion. The CONTRACTOR shall also <br /> reclaim any staging area or other ground disturbed during the course of the project located outside <br /> of the project area as defined by this Bid Document. Areas of disturbance will include those areas <br /> compacted as a result from equipment or vehicle traffic. All compacted areas will be ripped to a <br /> minimum depth of 8" on 24" centers. All haul roads will be fully regraded and reclaimed upon <br /> completion of the project. Additional final grading shall be accomplished to reduce any cuts left from <br /> machinery or oversteep slopes within impacted areas, if needed. <br /> The CONTRACTOR shall be fully responsible for any and all damage to property caused by his <br /> equipment or personnel. The CONTRACTOR shall ensure that the job site is restored to original <br /> or better condition and that the PROJECT MANAGER accept that the work is complete. See also <br /> Section 1.0 of the "Standard Work Specifications" included in CDMG General Bid Specifications, <br /> 1996. <br /> 6 <br />