Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />RECEIVED <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br />MAR 01 2000 <br />Division of Minerals & Geology <br />DATE: February 17, 2000 <br />TO: ALL CONTRACTORS BIDDING ON THE FRUITA MINE/AMERICAN SHIELD BOND <br />FORFEITURE. <br />FROM: PAUL KRABACHER, PROJECT MANAGER <br />PHONE 970-248-7253 <br />RE: AMENDMENT No. 1 TO PKA-0-455 <br />I would like to thank-you all for attending the pre-bid meeting held today for the Fruita Mine bond forfeiture site. <br />Below are the changes or additions to the bid. . <br />The Bid Document should be FRUITA MINE/AMERICAN SHIELD BOND FORFEITURE/C-81-015 <br />not M-81-015 <br />Bill Owens <br />Governor <br />Greg E. Walcher <br />Executive Director <br />Michael B. Long <br />Division Director <br />1. Enclosed is a site map of the proposed work for bid. Also enclosed is a post reclamation map showing existing <br />contours WITHOUT the developed gulley and associated deposition resulting from the 1999 flood. <br />2. The project Time of Completion has been extended to 35 calendar days after the receipt of the Notice to Proceed <br />with project work scheduled to commence April 3, 2000. <br />3. All terms and conditions of the Invitation and Bid other than as changed by Amendment No. 1 and this <br />amendment remain the same. <br />4. Receipt and acceptance of this amendment will be acknowledged by returning the Receipt and acceptance of <br />Amendment 1 to PKA-0-455 sheet attached. <br />tl.T 5H4ET ATTACHED <br />M:\imp\KRH\AMENDME.NTS\FRUITA.PK. doe <br />DECEIVED <br />FE13 2 2X2000