Laserfiche WebLink
FRUITA MINE/AMERICAN SHIELD BOND REVOCATION PROJECT/M-81-015 <br />BID SCHEDULE <br />PKA-0-455 <br />Item Description Qty. Unit Unit Amount <br /> Price <br />1. Mobilization/demob 1 Job N/A $ U00. ?Z <br /> <br />2. <br />Slope Drainage Construction - 3:1 max, <br />1 <br />Job <br />N/A w <br />$ e7 000. <br /> riprap lined, contour furrows connecting <br />3. Drainage Construction - rock outcrop to 1 Job N/A $ 5.000.- <br /> 3:1 drainage providing positive drainage <br /> from the east <br /> <br />BASE BID 00 <br />ADDITIVE ALTERNATES <br /> <br />1. <br />Equipment Rental - Excavator, CAT <br />40 <br />Hour 00 <br />$_5. '/hr. 00 <br />$_30000•S <br /> or equivalent sized w/ minimum <br /> 20' reach, turbo charged and operator <br />2. West Slope Revegetation - mulching, 1 Job N/A $ <br /> hand work for surface treatment, BIOSOL <br /> fertilizer, reseeding, 0.5 acre <br />3. Revegetation - fertilizing, seeding, 1 Job N/A $ SC50.°6 <br /> mulching, and crimping 2.0 acres <br /> GRAND TOTAL $?oo <br />THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br />Page 1 of 1 Page