Laserfiche WebLink
CIRCES Cost Estimatinq Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Task #: 03a State :Colorado Permit/job # : M-2008-027 <br />Date : 0711712008 County :Garfield Abbreviation :none <br />User : THM Site : Tepee Park Ranch Filename : M027-03a <br />Agency or organization name: DRMS <br />Permit or other job action :Final Reclamation Cost Estimate <br />Task description :Establish Final Lower Slope Grade 1.8H:1V <br />HOURLY EQUIPMENT COST <br />Machine description : Cat 322C L <br />Cost Breakdown <br />Ownership cost/hour : <br />Operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour <br />MATERIAL QUANTITIES <br />Initial <br />volume : 3,700 CCY <br />Utilization % <br />$34.40 NA <br />$44.83 100 <br />$32.96 NA <br />$112.20 <br />Swell <br />factor : 1.165 <br />Horsepower: 162 <br />Weight (MT) : 24.19 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : $112.20 <br />Loose <br />volume : 4,310 LCY <br />Source of estimated volume : Reclamation Plan and Map <br />Source of estimated swell factor: CAT Handbook <br /> <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty) <br />Basic job condition description : AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value: 0.29 minutes <br />Bucket Capacity <br />Rated bucket capacity : 1.44 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.68 Rock - Well blasted (60% - 75%) <br />Adjusted bucket capacity : 0.97 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 9,400 feet Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br /> <br />Unadjusted hourly unit production : 199.04 LCY/hour <br />Adjusted hourly unit production : 165.21 LCY/hour <br />Adjusted hourly fleet production : 165.21 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 26.09 hours <br />Unit cost : $0.679 per LCY Total job cost : $2,927