My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-11-04_GENERAL DOCUMENTS - C1981039 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981039
>
1997-11-04_GENERAL DOCUMENTS - C1981039 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2021 8:46:13 AM
Creation date
7/21/2008 10:38:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
11/4/1997
Doc Name
PKA-8-1036
From
DRMS
To
DRMS
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-.r <br /> STATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources <br /> 131:3 Sherman St.,Room 215 <br /> Denver,Colorado 80203 <br /> Phone:(303)866-3567 <br /> FAX:(303)832-8106 <br /> DEPARTMENT OF <br /> NATURAL <br /> RESOURCES <br /> Roy Romer <br /> November 4, 1997 Governor <br /> James S.Lochhead <br /> Executive Director <br /> Michael B.Long <br /> TO: ONNE BRANNON, DIVISION OF MINERALS & GEO Division Director <br /> FROM: AUL KRABACHER,DIVISION.OF.MINERALS.,&GEO <br /> RE: �6GRASSY GAP FORFEITURE, P.O. #PKA 98000000004 <br /> As discussed per Phone conversation with Maggie VanCleef on November 3,1997,- niteni-in <br /> need of repair at the Grassy Gap site was overlooked in the bidding process. Eroded drainages <br /> were identified.by Janet Binns_of-the Coal.Program as being in need of riprap for fill to prevent <br /> further sedimentation down stream. The awarded contractor, Dirt-N-Iron, obtained a price for <br /> the 24" minussiprap.at a delivered_and ply rost_tf$25_80Lc y. The nhannelsin need of riprap <br /> required 35 c.y. for a total cost increase of$938.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.