My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-11-13_GENERAL DOCUMENTS - C1981039
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981039
>
1997-11-13_GENERAL DOCUMENTS - C1981039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2021 10:05:46 AM
Creation date
7/21/2008 10:37:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
11/13/1997
Doc Name
PKA-9-1070
From
DRMS
To
DRMS
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources <br /> 1313 Sherman St., Room 215 <br /> Denver,Colorado 80203 <br /> Phone:(303)866-3567 <br /> FAX:(303)832-8106 NOV 13 1997 <br /> DEPARTMENT OF <br /> Division of Minerals&Geology NATURAL <br /> IMP RESOURCES <br /> Roy Romer <br /> November 12, 1997 Governor <br /> James S.Lochhead <br /> Executive Director <br /> Michael B.Long <br /> TO: McARDLE, DIVISION OF MINERALS,& GEO Division Director <br /> FROM: KRABACI ER,.DIV.ISION_OF.MINERALS & GEO <br /> RE: GRASSY GAP FORFEITURE, P.O. #PKA 98000000004 <br /> The maintenance work-performed_on Rockcastle_Coal C;_ompany's.Grassy Gap site was <br /> completed on November 6, 1997. The D5H only worked 14 hours as shown on the Equipment <br /> rental sheet. -All-road-maintenance work was completed as-directed-by J.Binns_of the Coal <br /> Program as well as the trash removal, standpipe repair, road base installation and riprap <br /> placement per-Field-Directive-#I and Change Order-#I- 1'he.50_c._y_-ofroad__base as_specified <br /> under Item#5 only was spread out over an approximate 240 linear foot stretch versus the <br /> approximate 5001£ as wished,_but-thef nal_result-accomplished_what was-needed-on-the-access <br /> road corner in question. D5H time primarily included work which involved the shaping and <br /> smoothing of-eroded_pit-access xoads, al'�g-runoffwithAitch work,and.cleaning-out water <br /> bar crossings. The standpipe repair included the sealing off of the exterior and interior bypass <br /> holes. Two separate-approximate 10.0.11--sections-of-eroded_ditch had 247 mien -iver_ruck <br /> placed one lift thick. And finally the trash removal included the off-site disposal of the+20,000 <br /> gallon water tank which wentAo_salvage,_3.8'diameter_off-roadhaul-tires,and_miscellaneous CSP <br /> and iron. The area where the trash was removed from was ripped and revegetated as well as the <br /> improved section-ofAheaccesssoad._The_awardedzontractorDirt_N1rQn,xDmpletedAhe_site <br /> work for $6,321.00, including the $938.00 increase for the delivered and placed riprap. This was <br /> $344.00 over-the-bid-price of_$5,977.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.