completion of dewatering, if necessary, CONTRACTOR shall stake the elevation of the side <br /> slopes of the pond at the elevation of the lower most inlet to the CMP riser. In order to ensure <br /> that the proper elevation is established, the use of a tripod mounted surveyors level is required. <br /> The surface area of the pond to be affected by this Task shall be scarified to a depth of four <br /> inches (4") through the use of a disc harrow or other appropriate means. One inch (1") of dry <br /> bentonite shall be placed on the prepared work area after the discing is completed. This <br /> material will be worked into the base and side slopes of the pond by discing the affected area <br /> until the bentonite is well incorporated into the scarified surface. <br /> Measurement and Payment <br /> There will be no measurement for payment. Payment for this task will be reflected in a lump <br /> sum bid under Item 4 on the Bid Schedule. This lump sum bid will cover all costs for identifying <br /> the area to be affected by this Task, preparation of the area, and purchase and installation of <br /> the bentonite materials. Payment shall be as this task is completed and approved by the <br /> PROJECT MANAGER. Such payment shall be considered full compensation for all labor, <br /> materials, equipment and all other items necessary and incidental to the completion of Task 4, <br /> Sealing Sediment. <br /> Task 5 Equipment Rental <br /> Areas in and adjacent to the Project Area may require slope reduction, excavation or erosion <br /> control work. CAT 416B Backhoe loader or equivalent 74 fhp machine with operator and a five <br /> (5) cubic yard on/off highway end dump truck with operator shall be furnished for additional <br /> work as needed. Additional rip rap materials may be needed to armor areas outside the rolled <br /> dip, and low water crossings. It is estimated that up to twenty cubic yards (20 yd 3) of <br /> additional screened two-inch average size rip rap material may be required. The use of the rip <br /> rap material is NOT guaranteed. <br /> The hours outlined in Item 5 of the Bid Schedule are NOT guaranteed. All work will be <br /> accomplished according to Specification 19.0, Equipment Rental, General Bid Specifications, <br /> 1996. <br /> Measurement and Payment <br /> Measurement and payment will be made as per Specification 19.0, Equipment Rental. <br /> Payment will be made at the unit prices established in Item 5 of the Bid Schedule. The hours <br /> outlined in Item 5 of the Bid Schedule are NOT guaranteed. Rip Rap will be paid by the cubic <br /> yard installed at the unit price bid in Item 5 of the Bid Schedule. The use of the additional rip <br /> rap material is NOT guaranteed. <br /> 6 <br />