Laserfiche WebLink
d. The State of Colorado must be named as additional insured on each <br /> comprehensive general liability policy; <br /> e. Certificates of insurance must be provided to the State within 10 working days <br /> after receipt of Award; and, <br /> f. Insurance shall include provision providing notification to the State 10 days prior <br /> to cancellation of the coverage. <br /> 3. Automobile Liability (Minimum). The contractor must carry a minimum of$600,000 <br /> combined single limit. <br /> VENDOR OFFSET <br /> Pursuant to C.R.S. 24-30-202.4 (as amended), the State Controller may withhold debts owed to <br /> state agencies under the vendor offset intercept system for: (a) unpaid child support debt or <br /> child support arrearages; (b) unpaid balance of tax, accrued interest, or other charges specified <br /> in Article 22, Title 39, C.R.S.; (c) unpaid loans due to the student loan division of the <br /> Department of Higher Education; (d) owed amounts required to be paid to the unemployment <br /> compensation fund; and (e) other unpaid debts owing to the State or any agency thereof, the <br /> amount of which is found to be owing as a result of final agency determination or reduced to <br /> judgment as certified by the controller. <br /> Work Description <br /> The attached General Conditions for Purchase Orders and Purchase Order Terms and <br /> Conditions apply to all work. <br /> Maintenance work to be accomplished at the Grassy Gap Coal Mine includes construction of <br /> two (2) low water crossings, repair of a sediment pond dewatering device and sealing of the <br /> base of the same sediment pond. A few miscellaneous tasks will be accomplished through the <br /> use of machine time. Maintenance of the Grassy Gap Mine is being accomplished by the State <br /> of Colorado, Division of Minerals and Geology, using forfeited reclamation bond monies. <br /> The Project is scheduled to be conducted during the week of October 11, 1999. It is anticipated <br /> that the project will be accomplished in no more than four (4) consecutive working days. <br /> The Grassy Gap Coal Mining operation was a permitted mining operation. The Colorado Mined <br /> Land Reclamation Board has revoked the operating permit, and forfeited the reclamation bond. <br /> The majority of the site was reclaimed by the coal mining company. The Division of Minerals <br /> and Geology periodically performs reclamation related maintenance work at the site. <br /> Accomplishing the required maintenance will help to stabilize the site by providing for control of <br /> snow melt and storm related run off, and by minimizing seepage from a sediment control pond <br /> located on a hillside. <br /> NOTE that Mobilization and Demobilization are not included as a separate line item. <br /> CONTRACTOR shall include charges for these items, if any, in the prices bid for the tasks <br /> described below. No additional payment for Mobilization and Demobilization will be made. <br /> 2 <br />